November 2010 – Darling Downs Power Station QLD

Global Directional Drilling Services was contracted for the installation of a 280mm Polyethylene Enveloper with a 160mm Polyethylene water pipe inside the enveloper under the Dalby-Kogan Road. The bore was at a length of 160m and is to be used for the transportation of water to … Continue reading

Share
Posted in 2009 - 2010 | Leave a comment

November 2010 – Yawalpah Rd – Coomera

Global Directional Drilling Services was contracted for the installation of a 225mm gas main for Tenix Networks Pty Ltd. The length of the bore was 320m, with 290m drilled through rock/blue stone and 30m through clay. A return line was used to pump back fluid … Continue reading

Share
Posted in 2009 - 2010 | Leave a comment

October 2010 – Salt Water Creek Hope Island

Global Directional Drilling Services was contracted by Tenix Networks Pty Ltd for the installation of a of a 200mm enveloper pipe to house a gas line. The drill shot was at a length of 400m through marine sand to coffee … Continue reading

Share
Posted in 2009 - 2010 | Leave a comment

September 2010 – Port Macquarie

Global Directional Drilling Services was employed to install 4000m of 63mm pipe for a new Optus link. This job was in a power easement with ground conditions varying from wet sand to rock.

Share
Posted in 2009 - 2010 | Leave a comment

July 2010 – Moura

Global Directional Drilling Services has been contracted by GD Pipelines to head to Moura (Qld) for the installation of a 630mm Enveloper Pipe for a major coal methane Energy Company. The enveloper pipe was used as a casing for a … Continue reading