November 2010 – Yawalpah Rd – Coomera

Global Directional Drilling Services was contracted for the installation of a 225mm gas main for Tenix Networks Pty Ltd. The length of the bore was 320m, with 290m drilled through rock/blue stone and 30m through clay. A return line was used to pump back fluid from the exit side to the recycler and back to the drill.

Share

Comments are closed.